** CORRECTION ** 80 METER QRP BEACON SCHEDULE

---------

From: Pete Rossi (rossi@VFL.Paramax.COM)
Date: Thu Feb 22 1996 - 22:50:32 EST


Change to 80 meter beacon power schedule..

I am going to run it on a 4 minute cycle ---- 2 minutes at 2 watts and then
2 minutes at 200 mW. This should provide more time to copy at the 200 mW
level. It will be at 2 watts at :00, :04, :08 ... past the hour.

Everything else remains the same...

I am trying to determine how productive 200 mW will be with the 80 meter QRN
and whether it will be worthwhile going to lower levels.

Good Luck.

---

Pete Rossi - WA3NNA rossi@vfl.paramax.com


Search QRP-L Archives

[ QRP-L Archive | ]
[ 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 ]

---------

This archive was generated by hypermail 2b29 on Fri Jun 02 2000 - 11:29:53 EDT

kd4ab@kd4ab.org